Aviation Consultants Ehmanns
Home  •  Contact  •  Disclaimer      

Projects


As we have confidence in the reliability of our customers, our customers trust also us in our confidentiality!

We honour the wishes of our customers not to be named; this is why some projects are without names, location or totally not named!

Our references list:


Airport Quick Check

• Capacity analyzing and capacity simulations of airfields and terminals, including NLA demands, Germany, USA, Denmark, China, Australia, Russia

• Optimization researches of the infrastructure and ground handling at international airports, Germany, England, France, USA, China


Master Planning or Feasibility Studies

• Functional Master Plan for UPS at their main European hub at Cologne airport, Germany

• Master Plan (layout) for a low cost airline, New York, USA

• Second opinion on the airside Master Plan of Berlin Brandenburg International Airport, Germany

• For Hochtief-AirPort: Project Manager for the Master plan for the 4 airports (Sochi, Krasnodar, Anapa, Gelendzhik) of Airports of the South, Russia

• For Hochtief-AirPort: Project Manager for Feasibility Studies on the airports of Omsk, Volgograd and Tyumen, Russia

• For Hochtief-AirPort: Project Manager for the Master plan of Tyumen Airport, Russia

• For Hochtief-AirPort: Project Manager for a Feasibility Study on Moscow Sheretmetjevo-4, Russia

• For Hochtief-AirPort: Project Manager of the Master plan for the airport of Sochi bid of Sochi for the Olympic Winter Games 2014, Russia


Optimization

- Hub

• UPS operation at their main European hub at Cologne airport, Germany

• Operational hub optimization for a low cost airline, New York, USA

- Infrastructure

• Optimization researches of the infrastructure at international airports, Germany, England, France, USA, China, Russia

• Capacity analyzing and capacity simulations of airfields and terminals, including NLA demands, Germany, USA, Denmark, China, Australia

• For Hochtief-AirPort: Project Manager of the International Architectural Competition for a new terminal at Pulkovo Airport St. Petersburg, Russia

• Advising Tyumen Airport Roshino on the extension of their existing terminal, Russia

- Passenger Operation

• Optimization researches of the infrastructure and ground handling at international airports, Germany, England, France, USA, China, Russia

• Trouble shooting and optimization of passenger handling at Charles de Gaulle Airport, France

• Olympic Games Operation

• Putting the new terminal at Sochi Airport into operation, Russia

• For Hochtief-AirPort: Project Manager of putting the Terminal 2 of Warsaw International Airport into operation within 6 weeks including training of the staff on the new equipment (Baggage sorting system, Boarding bridges, Cute Check-In, computerized traffic operation management etc.), Poland

• Optimization and training of the operational staff at Sochi Airport including the introduction of a new organizational chart, Russia

• Advising Tyumen Airport Roshino on optimization of the staff, Russia

- Cargo

• Cargo handling optimization for an integrator at many airports in Europe, Europe

- Aircraft Operation

• Aircraft handling optimization for an integrator at many airports in Europe, Europe

- Economic Efficiency

• Project manager for CRM between an airport, airlines and the retail business, Germany

• Study and report of the demands of an airline to fulfill the interest of the surrounding industry and to increase the economic efficiency of the possible market potentials, Germany


Simulations

• Simulations of the short and long term use of existing and future airport infrastructure; Airport Cologne-Bonn

• Capacity analyzing and capacity simulations of airfields and terminals, including NLA demands, Germany, USA, Denmark, China, Australia, Russia


Traffic Forecast

• Planning of the short and long term traffic prognoses; Airport Cologne-Bonn; Tyumen Airport Roshino, Moscow-Sheretmetjevo-4, Krasnodar Airport, Sochi Airport, Russia; Afghanistan; Iraq; Iceland, Greenland

• Long range traffic forecast for a low cost airline, New York, USA


NLA Demands & Operation

• Capacity analyzing and capacity simulations of airfields and terminals, including NLA demands, Germany, USA, Denmark, China, Australia


Other projects or experiences:

• Planning of the short and long term use of existing and future airport infrastructure, master planning, prognoses and simulations; Airport Cologne-Bonn, Germany

• Project Manager for the airport extension and to coordinate the ongoing construction work, Cologne-Bonn, Germany

• Manager of strategic traffic planning and development; Airport Cologne-Bonn

• Planning of the short and long term use of existing and future airport infrastructure; Airport Cologne-Bonn

• Planning and organizing within 4 hours an additional traffic (10 million yearly passengers) of Duesseldorf airport which was closed because of a fire disaster. Project Manager for this 6 weeks lasting operation; Airport Cologne-Bonn

• Project Manager of putting Terminal 2 at Cologne-Bonn airport into operation

• Project Manager of the Cologne-Bonn airport operation for the World Economic Summit meeting 1999 in Cologne

• Project Manager for an uninterruptable operation, caused by possible IT processor trouble of the year change from 1999 to 2000; Airport Cologne-Bonn

• Ground engineer with check and training authorization on A/C B 747, A 310/306

• Putting the new Lufthansa Hangar at MUC II into operation

• Instructor for aircraft maintenance training: Munich, Beijing, Moscow, Tashkent, Jakarta and Johannesburg